Hrvatski
     
Certification

 
Inspection systems qualification
Qualification of inspection systems for non-destructive inspection of primary circuit of WWER 1000 nuclear power plants according to RD EO 0487-05, ENIQ i IAEA methodologies

Reactor pressure vessel


Qualification of inspection systems for ultrasonic and visual inspection of reactor pressure vessel and internal structures of WWER 1000, V412 design for ZAO Atomstroyexport/Russia i.e. NPP Kudankulam/India
(image 1 ··· image 2 ··· image 3)

Steam generators

Qualification of inspection systems for eddy current, ultrasonic and visual inspection of WWER PGV 1000M, V412 steam generators for ZAO Atomstroyexport/Russia i.e. NPP Kudankulam/India
(image 1 ··· image 2 ··· image 3)

Pipelines

Qualification of inspection systems for ultrasonic inspection of Du300, Du350 and Du850 pipelines in WWER 1000, V412 nuclear powerplants for ZAO Atomstroyexport/Russia i.e. NPP Kudankulam/India
(image 1 ··· image 2 ··· image 3)


Personnel qualification and certification
HRID Ltd. NDT personnel Qualification and Certification:

ASNT Level III:
  • Eddy Current Testing (ECT). Level III - 2 holders
  • Ultrasonic Testing (UT), Level III - 1 holders
  • Visual Testing (VT), Level III - 1 holder
  • Magnetic Particle Testing (MT), Level III - 1 holder
  • Example
EN 473 Level III (TÜV CERT, Rheinland Group, Köln, Certification Center):
  • Eddy Current Testing (ECT). Level III - 2 holders
  • Ultrasonic Testing (UT), Level III - 1 holders
  • Visual Testing (VT), Level III - 1 holders
  • Magnetic Particle Testing (MT), Level III - 1 holder
  • Penetrant Testing (PT) - 1 holder
  • Example 1 ··· Example 2
NDT personnel: holders qualified and certified according to HRID Ltd. written practice, SNT-TC-1A/CP 189 and HR EN 473:
  • Ultrasonic Testing (UT), Level III - 4 holders
  • Ultrasonic Testing (UT), Level II - 2 holders
  • Eddy Current Testing (ECT). Level II - 19 holders
  • Visual Testing (VT), Level II - 2 holders
  • Magnetic Particle Testing (MT), Level II - 3 holders
  • Penetrant Testing (PT) - 2 holders
Qualified Data Analyst (QDA):
  • EPRI Performance Demonstration Database: Program for implementing a uniform industry-wide eddy current data analysts Qualification Program according to ISI Guidelines Appendix G. HRID is authorized by EPRI to perform training and exams of personnel. Individuals who successfully complete the program are formally recognized as a Qualified Data Analysts (QDA).
  • At the moment 22 persons are qualified.
 
Copyright © 2010 HRID & INTES